Summary
In the East Bradford area of our
operations, we were required to deliver the tightest inland
storm discharge quality standards available to the Environment
Agency. The Bradford Urban Pollution Management project is the
largest integrated study of its type within Yorkshire and has
upgraded the sewer network that serves many of our customers who
live in central Bradford.
Case Study
Our wastewater Capital Solutions
Partner, Mott MacDonald Bentley (MMB) took on the challenge of the
Bradford UPM project in December 2002. Their preliminary analysis
was used to demonstrate the unsustainablility of Environment
Agency’s initial requirements.
As part of the discussions with the
Environment Agency we were required to provide detailed analyses of
the Bradford Beck system to
demonstrate that our revised storage figures provided compliance
with the Environment Agency's standards and to further detail the
potential costs in terms of resource usage, buildability and the
impacts of operating such large storage tanks (odour, septicity,
drain down time and impact on Esholt WwTW).
In July 2003 the Environment Agency
confirmed that their original requirements were indeed
unsustainable and reduced their storage requirements to the more
appropriate set of standards which were agreed for the Bradford
Beck downstream of East
Bradford. This resulted in the
notional storage for the catchment reducing from >100,000 m3 to
22,500 m3. This storage provision still afforded
significant improvements to the River quality of Bradford Beck,
with 75% of the polluting load discharged prior to the study now
retained within the sewerage system. Also, this option provides the
appropriate level of protection for this watercourse whilst
providing best value to our customers.
Using the new agreed standards, MMB
then designed an effective and efficient stormwater management
strategy to solve the river water quality deficiencies in West
Bradford with a further 4,750 m3 reduction in the
notional storage volume.
This investment in both water quality
and aesthetic improvements to the Bradford Beck catchment leaves
the company well prepared for future regulation. Bradford Beck has
recently been designated as a Cyprinid (coarse fish) Freshwater
Fishery under the Fresh Water Fish Directive and this investment
should ensure no further protection is required. Further potential
investment to meet any requirements of the Water Framework
Directive in 2012 will need to be reviewed but it is hoped will be
unlikely.
“The Bradford UPM study has been an excellent example of
how our close working relationship with Yorkshire Water should
deliver significant environmental benefits to the Bradford Beck
"
- Bob Smith, Environment Agency
Benefits
- The residents of Bradford have received significant
improvements to their local living environment.
- The Bradford Beck will now be of a quality sufficient to
support fish throughout its length and existing fish populations
upstream of the city centre will be further protected.
- All of these improvements have been delivered with the minimum
disruption to the City and most efficient use of resources.
- Good working relations with project partners, EA, MWH and
MMB
- Our Asset Management Plan 3 obligations have been delivered on
time and within budget.
|